Commissioning of Triton Knoll wind farm - gangway on Seaway Strashnov
For the commissioning of the offshore windfarm Triton Knoll the Barge Master gangway is installed on the Seaway Strashnov, to give access to the WTG foundations.
Read more
Decommissioning Viking Vulcan & L10 - Gangway on Bokalift1
For the decommissioning of Viking Vulcan and L10 the Barge Master gangway is installed on the Bokalift1, to give access to the platforms.
Read more
Decommissioning Viking Vulcan - Gangway on Boka da Vinci
For the decommissioning of the Viking Vulcan platforms the Barge Master gangway is installed on the Boka da Vinci, to give access to the platforms.
Read more
Motion Compensated deep sea drilling
Large Diameter Drilling (LDD) and Barge Master have combined their expertise to complete a World first: drilling operations from a diving support and construction vessel (DSCV) in water depths in excess of 270m. By integrating LDD’s reverse circulation LD2500 drill rig with Barge Master’s motion...
Read more
Second BM-T40 system for walk-to-work vessel Shell/NAM
Wagenborg has awarded Barge Master with an additional contract for a 3D motion compensated crane, the BM-T40. The second motion compensated crane is installed on the ‘Kasteelborg’ vessel.
Read more
The ‘Next Generation Gangway’ at work in the Irish Sea
Barge Master and Bosch Rexroth’s ‘Next Generation Gangway’ is in operation on the subsea-support walk-to-work vessel VOS Start from Vroon Offshore Services.
Read more
Motion Compensated subsea Survey & Excavation
In the first half of 2017 the 3D motion compensated platform BM-T700 was used for subsea excavation in the North Sea by Belgium. The platform was equipped with an excavator also containing subsea survey sensors. Because a quick start was needed all the engineering and the mobilization was done in...
Read more
3D motion compensated pile drilling
Barge Master provided a new solution for subsea drilling from a floating barge. Something that has never been done before and not been possible without Barge Masters 3D motion compensation platform.
Read more
Servicing NAM/Shell gas production platforms - BM-T40
The Barge Master motion compensated knuckle boom crane is installed on the new Wagenborg Walk-to-Work vessel, the Kroonborg, designed and built by Royal Niestern Sander. The vessel and Barge Master system have been delivered in February 2015.
Read more
Bridge installation - BM-T700
The Barge Master system has been used during the first half of 2015 for the installation of a permanent bridge between a newly installed depletion compression platform (DCP) and an existing shallow water gas production platform (SWP) in the Malampaya field (Phillipines).
Read more
Page 1 of 2.
1
2
Next
+31(010) 409 00 60
+31(010) 409 00 60
Download
Home
News
Products
Gangway
Platform
Crane
Feeder
Applications
Projects
About us
Locations
Careers
Downloads
Contact