Menu
Home
News
Products
Gangway
Platform
Crane
Feeder
Applications
Projects
About us
Locations
Careers
Downloads
Contact
Barge Master has moved
13.05.2013
As of May 20th Barge Master will be located in a brand new office. Please feel free to visit us at our new address in Capelle a/d IJssel.Fascinatio Boulevard 8822909 VA Capelle a/d IJssel
Read more
Upcoming conferences
01.05.2013
Barge Master will be exhibiting at OTC Houston this week (May 5th – 9th) and continuing on to OGA Kuala Lumpur in early June. Don’t hesitate to stop by booth number 2327 in Houston to receive the most recent updates on the Barge Master system.
Read more
New Barge Master film
10.04.2013
Please have a look at the latest Barge Master video documentation. This video shows the whole process of developing the Barge Master, from scale model testing to real world applications as a supply and crane platform.
Read more
Intermodal São Paulo
20.03.2013
Barge Master will be exhibiting together with Roll-lift, Roll-dock and Roll-logistics at the Intermodal offshore conference in São Paulo during the first week of April. Feel free to come by and grab some newly updated flyers or just to have a short discussion with Martijn Koppert, who will be...
Read more
Barge Master exhibiting at AOG Perth
18.02.2013
This week Barge Master will be present at the Australian Oil & Gas Exhibition and Conference in Perth, Australia, taking place between the 20th and 22nd. If you happen to be in the area at this time make sure to check out our stand, complete with scale models and the newest information and videos...
Read more
Barge Master and GeoSea prove innovative offshore motion compensation solutions
05.02.2013
Barge Master and GeoSea have recently completed their final offshore test as part of a series of tests designed to prove innovative motion compensated supply and installation solutions.The workability during offshore supply and installation operations is strongly influenced by both weather and sea...
Read more
Barge Master Crane Trials
28.01.2013
Various tests were performed at the North Sea using a Liebherr LR1250 crawler crane on top of the Barge Master platform. The crane was placed onto the Barge Master in one single lift, sea fastened, and tested with a counterweight. Subsequently, the pontoon with the Barge Master was taken to the...
Read more
Barge Master Launch
18.12.2012
On the 12th of December Barge Master B.V. hosted the official launch of the Barge Master BM-001. The 700mT system was present at the event to be viewed by professionals in the offshore / near shore construction industry. The launch concludes a period of successful testing and marks the moment at...
Read more
OSEA 2012 Singapore expo
27.11.2012
Singapore, 27 - 30 November 2012Barge Master is exhibiting at the OSEA 2012 exhibition and conference which is held 27 - 30 November 2012. If you are visiting, come and see us at Marina Bay Sands, Singapore, stand 1B4-01.http://www.osea-asia.com/
Read more
International WorkBoatShow 2012 New Orleans expo
27.11.2012
New Orleans, 5 - 7 December 2012Barge Master is exhibiting at the International WorkBoatShow 2012 exhibition and conference which is held 5 - 7 December 2012. If you are visiting, come and see us at Morial Convention Center, New Orleans, booth 3445.http://www.workboatshow.com
Read more
Page 11 of 14.
Previous
1
....
5
6
7
8
9
10
11
12
13
14
Next
+31(010) 409 00 60
+31(010) 409 00 60
Download
Home
News
Products
Gangway
Platform
Crane
Feeder
Applications
Projects
About us
Locations
Careers
Downloads
Contact