Mobilization of the Barge Master
23 July 2012Barge Master has contracted Mammoet for the mobilization of the first Barge Master. The three foundations with installed main cylinders, together with the power unit and controls container have recently been delivered to Schiedam. In the beginning of August, a 80 x 24m barge will be moored at the Mammoet quay wall for the installation of the Barge Master.
Back to overview